| 2D drawing with datums and tolerances | Fixes the feature list engineering has to hold, and shows which dimensions cannot come out of the mould at all. | A marked-up sketch plus a STEP model opens the review; the drawing can follow. |
| STEP / STP / IGES model | Parting line, slides and gate position are decided from the solid, not from the print. | 2D-only parts can still be quoted, with a wider band on tooling cost. |
| Material grade, or the performance it must meet | Sets sintering temperature, heat treatment and the whole finishing chain behind it. | Describe the failure mode — wear, corrosion, fatigue — and engineering will propose the grade. |
| Annual volume, program life and release pattern | Tooling is amortised across the program, so volume decides the route more often than geometry does. | A first-year forecast is enough to start. |
| Mating part and its tolerance | A fit held to ±0.05 mm usually becomes a sizing or machining operation, and that decision is made here rather than in the price list. | The mating drawing answers this faster than the part drawing does. |
| Functional faces: sealing, bearing, gear mesh, thread | These faces cannot carry a parting line or an ejector mark, and that constraint shapes the tool and the gate. | Mark them on the drawing. An unmarked sealing face is the most common reason a quotation has to be reissued. |
| Load, wear, temperature and medium | Sets the density floor and decides whether hardening sits in the route at all. | Describe what happens today when the part fails. |
| Weight or envelope limit | Separates MIM from compaction before any other comparison is worth making. | Current part weight, or the target. |
| Inspection and documentation level | FAI, PPAP, material certificates and salt-spray testing are inspection hours and paperwork, both of which sit in the price. | Name the standard your customer audits against. |
| Current process and current price | Without them there is no comparison, only a number. | Can wait until after the first review. |
| Sample date and start-of-production date | Drives scheduling rather than price. Tooling alone is 25–30 days on recent programs. | The one date you cannot move. |